update
I am tired of this B S , i will have to do the inspection if i want to keep going .
I spoke with one guy that bought a machine 2015 and has to do this certification , for this machine has to spend $6000 plus expenses (travel hotel etc ), on top of that has to replace parts to make this machine comply with the code and the modifications has to be done by a technician so he spend $4500 on labor and another $4000 on parts, that was covered for the manufacturer because was a new machine , also the saler pay half of the labor, they even has to change the light to be an LED .
after all the modification the machine does not work properly but pass the inspection , so he has to replace some of the parts to the original state so the machine works .
I am looking at this scenario for one machine he spent about $14000 how much i will spend for 6 machines , and i am thinking that i have old machines i will have to redesign them to comply with the 2015 code , on that time LED light does not exist .
i have not idea what to do next i even talk to a lawyer to see if there is any way i can be exempt , but not luck
I do not want to think if they start to check all the business for that , we will see a lot companies out of business
if i have a machine 30 years old but UL approved and does not meet any standard , is ok because is UL listed and can be unsafer than the modern machines .
sorry to give you much to read but i am :mad2::mad2::mad2: :censor::censor: